Airtemp VG7SC Furnace Installation Manual
The Airtemp VG7SC is a high-efficiency gas furnace designed for residential heating applications. This variable-speed, multi-stage furnace features advanced combustion technology, electronic ignition, and smart control systems for optimal performance and energy efficiency. Below are key sections covering safety precautions, installation procedures, electrical connections, startup procedures, maintenance, and troubleshooting.
Features at a Glance
Key components: Variable-speed blower motor, multi-stage gas valve, hot surface ignitor, flame sensor, pressure switches, control board, and diagnostic LED.
| Feature | Description |
| Variable-speed blower | Provides precise airflow control for enhanced comfort and efficiency |
| Multi-stage gas valve | Two-stage heating operation for better temperature control |
| Hot surface ignitor | Electronic ignition system for reliable startup |
| Flame sensor | Monitors burner operation for safety |
| Diagnostic LED | Displays error codes for troubleshooting |
| Pressure switches | Ensures proper venting operation |
| Control board | Manages all furnace operations and safety controls |
| AFUE Rating | Up to 96% Annual Fuel Utilization Efficiency |
| Sound insulation | Reduced operating noise for quiet performance |
| Smart control compatibility | Works with programmable and smart thermostats |
Safety Precautions
Critical safety information for installers and homeowners.
- Turn off electrical power and gas supply before installation or service.
- Wear appropriate personal protective equipment (safety glasses, gloves).
- Ensure adequate combustion air and proper ventilation.
- Follow all local building codes and manufacturer specifications.
- Test for gas leaks after installation using approved methods.
WARNING! Failure to follow safety procedures may result in fire, explosion, carbon monoxide poisoning, or personal injury. Installation must be performed by qualified HVAC technicians.
Pre-Installation Requirements
Site preparation and requirements before installation.
- Verify furnace size matches heating load calculation.
- Ensure adequate clearance: 24 inches front, 6 inches sides, 6 inches rear, 24 inches top.
- Check location for proper drainage and accessibility.
- Verify gas supply line size and pressure requirements.
- Confirm electrical service meets furnace requirements.
CAUTION! Improper sizing or installation may void warranty and cause system failure.
Installation Procedures
Step-by-step furnace installation process.
- Position furnace: Place on level surface or install hanging brackets.
- Connect ductwork: Secure supply and return air connections.
- Install gas line: Use black iron pipe with proper thread sealant.
- Connect electrical: Follow wiring diagram for proper connections.
- Install venting: Use approved PVC materials for intake and exhaust.
- Connect condensate drain: Route to appropriate drainage location.
WARNING! Use two people for lifting; furnace is heavy and awkward to handle.
Electrical Connections
Wiring requirements and connections.
- Disconnect power at main electrical panel before wiring.
- Connect line voltage: 120V AC, 15 amp dedicated circuit required.
- Connect low voltage: 24V thermostat wiring (R, W, Y, G, C terminals).
- Ground furnace: Connect green ground wire to grounding point.
- Verify polarity: Ensure proper hot and neutral connections.
Tip: Use wire nuts and electrical tape for secure connections. Follow NEC and local codes.
Gas Line Connections
Natural gas or propane connection procedures.
- Shut off gas supply at main valve.
- Install sediment trap before gas valve connection.
- Use pipe dope or Teflon tape rated for gas service.
- Pressure test: Test at 14 inches WC for natural gas, 11 inches WC for propane.
- Check for leaks: Use soap solution or electronic gas detector.
WARNING! Never use matches or open flame to check for gas leaks.
Venting System
Intake and exhaust vent installation requirements.
- Use only approved PVC pipe (Schedule 40 or 80).
- Maintain proper slope: 1/4 inch per foot toward furnace.
- Keep vent runs as short and straight as possible.
- Maintain clearance from windows, doors, and air intakes.
- Install termination caps according to manufacturer specifications.
CAUTION! Improper venting may cause carbon monoxide buildup and system failure.
Startup and Commissioning
Initial startup procedures and system verification.
- Restore electrical power and gas supply.
- Set thermostat to heat mode and raise temperature setting.
- Verify proper ignition sequence and flame establishment.
- Check gas pressure: Adjust if necessary per specifications.
- Measure temperature rise: Should be within 35-65°F range.
- Verify airflow: Adjust blower speed if required.
WARNING! Monitor first few cycles for proper operation and check for unusual odors or sounds.
Maintenance Guidelines
Routine maintenance for optimal performance.
- Monthly: Check and replace air filter as needed.
- Annual: Professional inspection and cleaning.
- Clean burners and heat exchanger annually.
- Check condensate drain and trap for blockages.
- Verify vent system integrity and clearances.
- Test safety controls and ignition system.
CAUTION! Turn off power and gas before performing any maintenance.
Specifications
- Model: VG7SC
- Input Capacity: 40,000 - 120,000 BTU/H
- AFUE Rating: Up to 96%
- Stages: Two-stage heating
- Blower Type: Variable-speed ECM
- Electrical: 120V AC, 60Hz
- Gas Type: Natural gas or propane
- Venting: PVC (2-inch recommended)
- Operating Temp Range: -30°F to 120°F ambient
- Warranty: Limited lifetime heat exchanger, 10 years parts
Troubleshooting
| Symptom | Possible Cause | Corrective Action |
| Furnace won't start | Power, thermostat, door switch | Check circuit breaker, thermostat settings, door switch engagement |
| No heat | Gas supply, ignitor, flame sensor | Verify gas valve open, check ignitor operation, clean flame sensor |
| Short cycling | Airflow, filter, overheating | Replace filter, check blower, verify proper airflow |
| Blower won't run | Motor, capacitor, control board | Check motor operation, test capacitor, verify control board signals |
| Error codes displayed | Various system faults | Refer to diagnostic chart in service manual |
Reset: Turn power off for 30 seconds, then restore to reset control board.
Service: 1-800-AIRTEMP; www.airtemp.com