Carrier Infinity 98 Gas Furnace Installation Manual

The Carrier Infinity 98 Gas Furnace is a high-efficiency residential heating system with up to 98.5% AFUE rating, variable-speed blower motor, two-stage gas valve operation, advanced diagnostic controls, and compatibility with Carrier's Infinity System control. This manual covers safety precautions, installation procedures, startup instructions, wiring diagrams, and maintenance guidelines for professional HVAC technicians.

1. Safety Precautions 2. Unit Specifications 3. Pre-Installation Requirements 4. Installation Procedures 5. Electrical Wiring 6. Gas Piping Connections 7. Venting System 8. Startup and Commissioning 9. Control System Setup 10. Maintenance Procedures 11. Troubleshooting Guide

Safety Precautions

Critical safety information for installation and service personnel.

HazardPrecaution
Gas LeaksCheck all connections with leak detection solution before startup
Electrical ShockDisconnect power before servicing; follow NEC guidelines
Carbon MonoxideEnsure proper venting; test for CO after installation
Combustion AirProvide adequate combustion and ventilation air per code
High TemperatureAllow unit to cool before handling heat exchanger components

Unit Specifications

Pre-Installation Requirements

Site preparation and verification before installation.

  1. Verify unit size matches heat load calculation
  2. Check local codes for compliance requirements
  3. Ensure adequate clearances: 1" sides, 6" vent, 24" front
  4. Confirm adequate combustion air supply
  5. Inspect existing gas line for proper size and pressure

WARNING! Installation by qualified HVAC technician required. Improper installation may create hazardous conditions.

Installation Procedures

Step-by-step installation guidelines.

  1. Position furnace: Level unit on solid, stable base
  2. Connect return air: Secure ductwork to return air opening
  3. Connect supply air: Attach supply ductwork to plenum
  4. Install filter rack: Position for easy filter access
  5. Secure unit: Fasten to floor or platform as required

CAUTION! Unit is heavy; use proper lifting equipment and techniques.

Electrical Wiring

Electrical connections and requirements.

ConnectionSpecification
Line Voltage120V AC, 15 amp circuit minimum
Low Voltage24V AC thermostat circuit
Blower MotorECM variable-speed with proprietary control
GroundingMust be properly grounded per NEC
Control BoardIntegrated Infinity control system

Gas Piping Connections

Gas supply requirements and connection procedures.

  1. Shut off gas supply at main valve
  2. Install sediment trap in gas line
  3. Use approved pipe thread compound or tape
  4. Connect gas line to unit gas valve
  5. Pressure test: 14" WC natural gas, 11-14" WC LP

WARNING! Gas piping must be sized according to length and BTU load. Consult local codes.

Venting System

Category IV venting requirements and installation.

Startup and Commissioning

Initial startup procedure and system verification.

  1. Verify all connections are secure and proper
  2. Open gas supply valve slowly
  3. Power on furnace at electrical disconnect
  4. Set thermostat to call for heat
  5. Observe ignition sequence and flame
  6. Measure temperature rise (35-65°F range)
  7. Check gas pressure: 3.5" WC natural gas
  8. Verify proper vent operation

Control System Setup

Infinity control system configuration.

Infinity Controller: Compatible with Carrier Infinity thermostats for advanced zoning, humidity control, and system monitoring.

Configuration: Access service menu for blower settings, staging parameters, and system optimization. Default settings optimized for most installations.

Maintenance Procedures

Routine maintenance requirements.

Troubleshooting Guide

SymptomPossible CauseCorrective Action
No heatPower, thermostat, pressure switchCheck power supply; verify thermostat setting; inspect pressure switch tubing
Short cyclingDirty filter, high limitReplace filter; check airflow; verify proper temperature rise
Blower not operatingMotor, control board, wiringCheck motor connections; test control board outputs; verify blower settings
Lockout conditionIgnition failure, flame senseCheck gas supply; clean flame sensor; verify proper grounding
Error codes displayedSystem faultsRefer to control board LED codes; consult service manual

Service: Contact Carrier authorized dealer for technical support. Warranty registration required within 60 days of installation.

Carrier Infinity 98 Gas Furnace Installation Manual © - All Rights Reserved 2025