Daikin Furnace DC96VC Installation Manual

The Daikin Furnace DC96VC is a high-efficiency gas furnace with variable-capacity operation, 96% AFUE rating, two-stage gas valve, variable-speed blower motor, durable heat exchanger, diagnostic LED system, and compatibility with Daikin thermostats. Designed for residential use with natural gas or propane, it requires professional installation. Below are key sections for safety, specifications, installation procedures, wiring, startup, and troubleshooting.

1. Safety Precautions 2. Specifications 3. Pre-Installation Requirements 4. Installation Procedures 5. Electrical Wiring 6. Gas Line Connection 7. Venting System 8. Startup and Commissioning 9. System Configuration 10. Maintenance Guidelines 11. Troubleshooting

Safety Precautions

Critical safety information for installers and homeowners.

HazardPrecaution
Gas LeaksCheck all connections with leak detector; never use open flame
Electrical ShockDisconnect power before servicing; follow local electrical codes
Carbon MonoxideEnsure proper venting; install CO detectors in living areas
Fire HazardMaintain clearance from combustibles; install smoke detectors
Personal InjuryWear safety glasses and gloves during installation

Specifications

Pre-Installation Requirements

Site preparation and necessary tools/materials.

  1. Location: Indoor installation only; protected from weather
  2. Clearance: Minimum 1" from combustible materials
  3. Foundation: Level, solid surface capable of supporting unit weight
  4. Gas Supply: Adequate pressure and volume; shut-off valve required
  5. Electrical: Dedicated 115V circuit with proper grounding
  6. Venting: Plan route for intake and exhaust pipes

WARNING! Installation must comply with local codes and regulations.

Installation Procedures

Step-by-step installation guide.

  1. Position unit: Place on level surface in designated location
  2. Ductwork connection: Attach supply and return ducts securely
  3. Gas line: Connect to gas supply with approved piping
  4. Venting: Install PVC intake and exhaust pipes per manual
  5. Electrical: Connect power and thermostat wiring
  6. Condensate drain: Install drain line with proper slope
  7. Final inspection: Verify all connections are secure

CAUTION! Use two people for lifting; unit is heavy.

Electrical Wiring

Wiring connections and requirements.

ConnectionSpecification
Power Supply115V, 60Hz, 15A circuit with disconnect
ThermostatStandard 24V connections (R, W, Y, G, C)
Blower MotorVariable-speed ECM motor
Control BoardIntegrated diagnostic LED system
GroundingProper equipment grounding required

Tip: Label all wires before disconnecting existing equipment.

Gas Line Connection

Gas piping and pressure requirements.

  1. Shut off gas supply at main valve
  2. Install sediment trap in gas line
  3. Use approved gas pipe (black iron or CSST)
  4. Apply pipe compound to male threads only
  5. Connect to furnace gas valve with union fitting
  6. Check for leaks with bubble solution or detector
  7. Verify gas pressure: 3.5" w.c. natural gas, 10" w.c. propane

WARNING! Gas line installation must be performed by qualified technician.

Venting System

Intake and exhaust vent installation.

CAUTION! Do not use cellular core PVC; ensure proper support for long runs.

Startup and Commissioning

Initial system startup procedure.

  1. Verify all connections are complete and secure
  2. Open gas shut-off valve slowly
  3. Restore electrical power to furnace
  4. Set thermostat to heat mode above room temperature
  5. Observe ignition sequence: inducer motor, igniter, gas valve
  6. Check flame appearance: steady blue flame with yellow tips
  7. Measure temperature rise: 35-65°F across heat exchanger
  8. Verify proper airflow and duct temperatures

System Configuration

Control settings and adjustments.

SettingDescription
Blower SpeedAdjust for proper airflow (CFM settings)
Gas PressureVerify high and low fire settings
Thermostat TypeCompatible with single-stage and two-stage thermostats
Diagnostic CodesLED flash patterns for troubleshooting
DIP SwitchesConfiguration for altitude, blower delay, etc.

Maintenance Guidelines

Routine maintenance schedule.

  1. Monthly: Check air filter; replace when dirty
  2. Annual: Professional inspection and cleaning
  3. Clean burners and heat exchanger
  4. Check vent system for obstructions
  5. Verify gas pressure and electrical connections
  6. Lubricate inducer motor if required
  7. Test safety controls and limit switches

WARNING! Only qualified technicians should perform internal maintenance.

Troubleshooting

SymptomPossible CauseCorrective Action
No heatPower, thermostat, gas supplyCheck circuit breaker, thermostat setting, gas valve
Furnace won't startDoor switch, pressure switchEnsure doors closed; check pressure switch tubing
Short cyclingDirty filter, airflow restrictionReplace filter; check for blocked vents/registers
Lockout modeIgnition failure, flame sensorReset power; clean flame sensor; check gas pressure
Unusual noisesBlower, inducer motorInspect for obstructions; check motor bearings

Reset: Turn power off for 30 seconds, then restore.

Service: Contact authorized Daikin dealer for technical support.