Furnace PG8MAA048090 Manual

The Furnace PG8MAA048090 is a high-efficiency gas furnace with 48,000 BTU input capacity, 90% AFUE rating, single-stage operation, natural gas compatibility, electronic ignition, multi-speed blower motor, durable heat exchanger, safety controls, and compact design. Suitable for residential heating applications. Below are key sections for safety, features, installation, operation, maintenance, and troubleshooting.

1. Features at a Glance 2. Installation 3. First-Time Setup 4. Specifications 5. Controls and Settings 6. Connecting to HVAC System 7. Operating Procedures 8. Safety Features 9. Maintenance & Cleaning 10. Regulatory Information 11. Troubleshooting

Features at a Glance

Key components: Heat exchanger, blower assembly, gas valve, ignition system, control board, flue outlet, filter rack, and safety switches.

FeatureDescription
Heat ExchangerDurable stainless steel construction for efficient heat transfer
Blower MotorMulti-speed ECM motor for quiet operation
Gas ValveSingle-stage operation with safety shutoff
Ignition SystemElectronic hot surface ignition
Control BoardIntegrated furnace control with diagnostic LEDs
Filter RackStandard 1-inch filter compatibility
Flue OutletPVC venting compatible
Pressure SwitchesSafety verification of draft and airflow
Limit SwitchesOver-temperature protection
Thermostat ConnectionStandard 24VAC control wiring

Installation

Unpack and inspect all components. Ensure proper clearances and venting requirements.

  1. Position furnace: Place on stable, level surface with proper clearances (1-inch minimum from combustible materials).
  2. Connect gas supply: Use approved gas piping; pressure test for leaks before operation.
  3. Install venting: Use PVC piping for intake and exhaust; maintain proper slope.
  4. Electrical connections: Connect 120V power supply and thermostat wiring.
  5. Ductwork: Connect supply and return ducts securely.

WARNING! Gas furnace installation must be performed by qualified HVAC technician. Follow all local codes and manufacturer instructions.

First-Time Setup

Complete installation verification and initial startup procedure.

  1. Verify all connections: Gas, electrical, venting, and ductwork.
  2. Install air filter: Place clean 1-inch filter in filter rack.
  3. Gas pressure check: Measure and adjust manifold pressure to 3.5" WC.
  4. Startup sequence: Turn on power; set thermostat to heat mode.
  5. Check operation: Verify proper ignition, heating, and blower operation.
  6. Combustion analysis: Verify proper CO levels and efficiency.

CAUTION! Never bypass safety controls. Ensure proper ventilation during operation.

Specifications

Controls and Settings

Integrated control board with diagnostic LEDs and DIP switch settings.

Control Board: LED status lights for power, heating, blower, and error codes.

DIP Switch Settings: Blower speed adjustments for heating and continuous fan modes. Gas Valve: Single-stage operation with pressure regulation. Thermostat: Compatible with most 24VAC heating thermostats. Limit Controls: Auto-reset high limit protection. Pressure Switches: Verify proper draft inducer operation.

Connecting to HVAC System

Integration with existing ductwork, thermostat, and gas supply.

  1. Turn off all power and gas supply before connections.
  2. Duct connections: Secure supply and return ducts with proper sealing.
  3. Thermostat wiring: Connect R, W, G, C terminals as required.
  4. Gas line: Use approved pipe compound on threaded connections.
  5. Venting: Maintain proper slope (1/4" per foot minimum).

Tip: Label all wires during installation for easy future service.

Operating Procedures

Normal heating operation and seasonal startup.

  1. Set thermostat: Adjust to desired temperature in heat mode.
  2. Startup sequence: Control board initiates pre-purge, ignition, and main burner operation.
  3. Heating cycle: Burners ignite; blower starts after heat exchanger warms.
  4. Shutdown: Burners turn off; blower continues for post-purge cooling.
  5. Continuous fan: Use G terminal for constant air circulation.

WARNING! Never operate without proper venting and air filter installed.

Safety Features

Multiple safety systems including flame rollout switches, high limit controls, pressure switches, and ignition safety lockout.

Maintenance & Cleaning

Regular maintenance ensures optimal performance and longevity.

Monthly: Check and replace air filter as needed. Annual: Professional inspection of heat exchanger, burners, venting, and safety controls. Cleaning: Keep area around furnace clear; vacuum burner area during service.

CAUTION! Turn off power and gas before any maintenance. Only qualified technicians should service gas components.

Regulatory Information

UL certified; meets ANSI Z21.47 standards for gas furnaces. CSA certified for US and Canadian markets. Installation must comply with National Fuel Gas Code NFPA 54 and local building codes. For technical support, contact manufacturer or visit authorized service centers.

Troubleshooting

SymptomPossible CauseCorrective Action
Furnace won't startPower, thermostat, door switchCheck circuit breaker; verify thermostat setting; ensure door properly closed.
No heatGas supply, ignition, filterVerify gas valve on; check for ignition attempts; replace dirty filter.
Short cyclingDirty filter, limit switchReplace air filter; check for blocked vents or registers.
Blower not runningMotor, capacitor, control boardCheck for power to blower; verify control board signals.
Error codes flashingSafety lockout, sensor issuesRefer to LED flash codes in service manual; reset if safe.

Reset: Turn power off for 30 seconds to reset control board.

Service: Contact qualified HVAC technician for all gas and electrical repairs.

Furnace PG8MAA048090 Manual © - All Rights Reserved 2025