Keeprite Furnace Installation Manual PDF
The Keeprite Furnace Installation Manual provides comprehensive guidance for the proper installation, setup, and maintenance of Keeprite residential and commercial furnace systems. This manual covers safety procedures, technical specifications, installation steps, wiring diagrams, and troubleshooting guidelines for various Keeprite furnace models including gas, oil, and electric units. Below are key sections for professional installers and technicians.
Safety Precautions
Critical safety information for furnace installation and operation.
| Hazard | Precaution |
| Gas leaks | Check all connections with leak detection solution |
| Electrical shock | Disconnect power before servicing |
| Carbon monoxide | Ensure proper venting and combustion air |
| Fire hazard | Maintain clearance from combustible materials |
| Burn injuries | Allow furnace to cool before handling |
| Explosion risk | Never use matches to check for gas leaks |
Model Specifications
Technical specifications for Keeprite furnace series.
- Models: KRS, KRC, KRE series (40,000-120,000 BTU)
- Fuel Types: Natural gas, Propane, Oil, Electric
- Efficiency: 80% AFUE to 96% AFUE models
- Voltage: 120V/240V, 60Hz
- Blower Motors: PSC and ECM types
- Heat Exchanger: Aluminized steel or stainless steel
- Warranty: 20-year heat exchanger, 5-year parts
- Dimensions: Varies by model (check specific model manual)
Pre-Installation Requirements
Preparation steps before furnace installation.
- Verify local codes and obtain necessary permits
- Check furnace model matches job requirements
- Inspect unit for shipping damage
- Ensure adequate workspace and clearance
- Verify gas supply and electrical service adequacy
- Plan venting and combustion air routes
WARNING! Installation must comply with all local building codes and regulations.
Installation Procedures
Step-by-step furnace installation guide.
- Position furnace: Level on solid base, maintain clearances
- Connect ductwork: Secure with sheet metal screws and mastic
- Install gas line: Use black iron pipe, apply pipe dope
- Electrical connections: Follow wiring diagram precisely
- Venting: Install according to manufacturer specifications
- Condensate drain: Route to approved drain location
- Thermostat: Install compatible 24V thermostat
CAUTION! Only qualified technicians should perform installation.
Electrical Wiring
Electrical connection requirements and diagrams.
| Connection | Specification |
| Line Voltage | 240V, 60Hz (check model plate) |
| Circuit Breaker | Dedicated 15-30A (based on model) |
| Low Voltage | 24V thermostat circuit |
| Grounding | Proper equipment grounding required |
| Wire Gauge | 12 AWG minimum for line voltage |
| Conduit | As required by local codes |
Venting and Ductwork
Venting system installation guidelines.
- Category I venting: Use B-vent for natural draft furnaces
- Direct vent: Follow manufacturer pipe specifications
- PVC venting: For high-efficiency condensing models
- Combustion air: Provide adequate fresh air supply
- Duct sizing: Calculate based on CFM requirements
- Insulation: Insulate supply ducts in unconditioned spaces
Tip: Perform combustion analysis after installation.
Gas Line Connections
Gas supply connection procedures.
- Shut off gas supply at main valve
- Install sediment trap before gas valve
- Use approved pipe compound on threaded connections
- Install manual shutoff valve within 6 feet of unit
- Pressure test: 14" WC for 10 minutes (no drop)
- Check manifold pressure: Adjust as specified
- Leak check: Use bubble solution on all connections
WARNING! Gas connections must be performed by licensed gas fitter.
Startup and Commissioning
Initial startup and system verification.
- Verify all connections are secure
- Restore power and gas supply
- Set thermostat to heat mode
- Check ignition sequence and flame
- Measure temperature rise (35-65°F typical)
- Verify blower operation and airflow
- Test safety controls and limit switches
- Complete installation checklist
Maintenance Guidelines
Routine maintenance procedures.
- Monthly: Check air filter, replace as needed
- Annual: Professional inspection and cleaning
- Seasonal: Test safety controls and operation
- Components: Clean blower, check heat exchanger, lubricate motor if required
- Combustion: Check and adjust gas pressure if necessary
CAUTION! Turn off power before performing any maintenance.
Troubleshooting
Common issues and solutions.
| Symptom | Possible Cause | Corrective Action |
| No heat | Thermostat, power, gas valve | Check thermostat setting, circuit breaker, gas supply |
| Furnace short cycles | Dirty filter, blocked vent | Replace filter, check venting for obstructions |
| Blower doesn't run | Motor, capacitor, control board | Check voltage to motor, test capacitor, inspect control board |
| Gas odor | Leak in gas line | Shut off gas immediately, evacuate, call professional |
| Error codes | Various system faults | Refer to diagnostic chart in manual |
Warranty Information
Keeprite furnace warranty coverage.
- Heat Exchanger: 20-year limited warranty
- Parts: 5-year limited warranty
- Labor: 1-year from date of installation
- Registration: Required within 90 days of installation
- Exclusions: Damage from improper installation, lack of maintenance
- Transferable: To subsequent homeowners with registration
Service: 1-800-387-8725; www.keeprite.com