Nordyne Electric Furnace Parts Manual

The Nordyne Electric Furnace is a high-efficiency heating system designed for residential and light commercial applications. This manual provides comprehensive information on parts identification, replacement procedures, technical specifications, and maintenance guidelines for Nordyne electric furnace models. Below are key sections covering parts diagrams, installation guidelines, troubleshooting, and technical specifications.

1. Parts Overview 2. Installation Guidelines 3. Technical Specifications 4. Controls and Components 5. Wiring Diagrams 6. Replacement Procedures 7. Maintenance Schedule 9. Safety Information 10. Regulatory Compliance 11. Troubleshooting Guide

Parts Overview

Key components: Heating elements, blower assembly, control board, sequencers, limit switches, transformer, and safety devices.

Part NameDescription
Heating ElementsElectric resistance coils that generate heat
Blower AssemblyCirculates air through the duct system
Control BoardMain system controller and safety monitor
SequencersControls staging of heating elements
Limit SwitchesSafety devices that prevent overheating
TransformerSteps down voltage for control circuit
Thermal FusesOver-temperature protection devices
Blower MotorDrives the blower fan assembly
CapacitorsProvides starting torque for motors
RelaysElectrical switches for component control

Installation Guidelines

Proper installation ensures optimal performance and safety. Follow all local electrical codes and manufacturer specifications.

  1. Electrical Connections: Verify proper voltage and amperage requirements before wiring.
  2. Ductwork: Ensure proper sizing and sealing of supply and return ducts.
  3. Clearances: Maintain minimum clearances as specified in installation manual.
  4. Grounding: Properly ground all electrical components per NEC requirements.

WARNING! Installation must be performed by qualified HVAC technician. Electrical shock hazard exists.

Technical Specifications

Controls and Components

Access control board via front service panel. Main components include sequencer relays, limit controls, and transformer.

Control Board: Monitors safety circuits, controls blower operation, manages heating stages. Sequencers: Time-delay relays that stage heating elements to prevent power surge. Limit Switches: Automatic reset high-limit protection. Blower Control: Adjustable delay-on-break and delay-on-make settings.

Wiring Diagrams

Refer to specific model wiring diagram for proper connections. Diagrams located on inside of service panel door.

  1. Disconnect all power before accessing electrical components.
  2. Verify wire sizing matches electrical load requirements.
  3. Use proper strain relief and conduit where required.
  4. Test all safety circuits after installation.

Tip: Always reference the specific model number when ordering replacement parts.

Replacement Procedures

Authorized replacement parts ensure system reliability and safety.

  1. Heating Elements: Disconnect power, remove access panel, disconnect wires, remove mounting hardware.
  2. Blower Motor: Disconnect power, remove blower assembly, disconnect electrical connections, remove set screws.
  3. Control Board: Label all wires before disconnecting, remove mounting screws, install new board.
  4. Limit Switches: Test continuity before replacement, disconnect wires, remove mounting clip.
  5. Sequencers: Note wire positions, remove from mounting rail, install identical replacement.

WARNING! Always disconnect power before servicing. Use only Nordyne approved replacement parts.

Maintenance Schedule

Regular maintenance ensures optimal performance and extends equipment life.

Safety Information

High voltage electrical hazard exists. Follow all lockout/tagout procedures.

CAUTION! Electrical shock hazard. Disconnect all power sources before servicing. High temperatures present during operation.

Regulatory Compliance

UL listed and complies with NEC requirements. Meets ANSI Z21 standards for safety. Certified for residential installation. All components RoHS compliant. For technical support, contact Nordyne at 1-800-422-4328 or visit www.nordyne.com.

Troubleshooting Guide

SymptomPossible CauseCorrective Action
No heatPower supply, sequencer, limit switchCheck circuit breakers, test sequencer operation, verify limit switch continuity.
Blower not runningMotor, capacitor, control boardTest motor windings, check capacitor, verify control board output.
Insufficient heatHeating elements, airflowTest element continuity, check for restricted airflow, verify voltage.
Frequent cyclingDirty filter, limit switchReplace air filter, test high limit operation, check duct restrictions.
Blower runs continuouslyControl board, thermostatCheck thermostat settings, test control board fan relay.

Reset: Turn power off for 30 seconds to reset control board.

Service: 1-800-422-4328; www.nordyne.com

Nordyne Electric Furnace Parts Manual © - All Rights Reserved 2025