The Nordyne Furnace LP Conversion Kit is designed to convert natural gas furnaces to liquid propane operation. This comprehensive kit includes all necessary components, tools, and instructions for safe and proper conversion. The conversion process involves orifice replacement, gas valve adjustment, pressure regulation, and safety verification. Below are key sections covering safety warnings, kit contents, installation procedures, testing, and troubleshooting.
Critical safety information for LP conversion process.
| Warning | Description |
|---|---|
| Gas Leak Hazard | Always check for leaks with soap solution after conversion |
| Professional Installation | Conversion must be performed by qualified technician |
| Proper Ventilation | Ensure adequate combustion air and proper venting |
| Gas Pressure Verification | Manifold pressure must be set to 10-11 inches WC for LP |
| Carbon Monoxide Risk | Install CO detectors in living areas |
| Electrical Safety | Disconnect power before beginning conversion |
| Gas Shutoff | Turn off gas supply at main valve before starting |
| Proper Tools | Use only approved tools and equipment |
| Local Codes | Comply with all local building and gas codes |
| Manufacturer Specifications | Follow Nordyne installation guidelines exactly |
Complete inventory of conversion kit components.
WARNING! Verify all components are present before beginning installation. Do not substitute components.
Preparation steps before beginning conversion.
CAUTION! Failure to properly shut off gas and electricity can result in fire, explosion, or electrocution.
Proper pressure settings and verification procedures.
Manifold Pressure: Set to 10-11 inches WC for LP gas operation. Use manometer connected to pressure tap.
Gas Valve Adjustment: Turn adjustment screw clockwise to increase pressure, counterclockwise to decrease.
Leak Testing: Apply soap solution to all gas connections. Bubbles indicate leaks.
Combustion Analysis: Verify proper CO2 levels and flame characteristics.
Final checks and system validation.
Tip: Allow furnace to complete several heating cycles before final inspection.
Supported furnace models and technical requirements.
Routine maintenance for LP furnace operation.
Annual inspection by qualified technician. Regular filter changes. Burner cleaning as needed. Vent system inspection. CO detector testing.
CAUTION! Only qualified personnel should perform maintenance on gas appliances.
Limited warranty coverage and terms.
90-day limited warranty on conversion kit components. Original furnace warranty remains in effect when conversion is performed by authorized technician. Warranty void if installation instructions are not followed exactly.
| Symptom | Possible Cause | Corrective Action |
|---|---|---|
| Furnace won't ignite | Gas pressure incorrect | Verify manifold pressure setting (10-11" WC) |
| Yellow flame | Air mixture incorrect | Adjust primary air shutter; clean burners |
| Gas odor | Leaking connection | Shut off gas immediately; check all connections with soap solution |
| Furnace short cycles | Overheating | Check airflow; clean filter; verify venting |
| No heat output | Thermostat issue | Check thermostat settings and wiring |
Technical Support: 1-800-422-4328; www.nordyne.com
Emergency Service: Contact qualified HVAC technician immediately for gas leaks or CO detection