Nordyne Furnace LP Conversion Kit Manual

The Nordyne Furnace LP Conversion Kit is designed to convert natural gas furnaces to liquid propane operation. This comprehensive kit includes all necessary components, tools, and instructions for safe and proper conversion. The conversion process involves orifice replacement, gas valve adjustment, pressure regulation, and safety verification. Below are key sections covering safety warnings, kit contents, installation procedures, testing, and troubleshooting.

1. Safety Warnings and Precautions 2. Kit Contents and Components 3. Pre-Installation Requirements 4. Conversion Procedure 5. Pressure Adjustment and Testing 6. Post-Installation Verification 7. Technical Specifications 8. Maintenance Guidelines 9. Warranty Information 10. Troubleshooting Guide

Safety Warnings and Precautions

Critical safety information for LP conversion process.

WarningDescription
Gas Leak HazardAlways check for leaks with soap solution after conversion
Professional InstallationConversion must be performed by qualified technician
Proper VentilationEnsure adequate combustion air and proper venting
Gas Pressure VerificationManifold pressure must be set to 10-11 inches WC for LP
Carbon Monoxide RiskInstall CO detectors in living areas
Electrical SafetyDisconnect power before beginning conversion
Gas ShutoffTurn off gas supply at main valve before starting
Proper ToolsUse only approved tools and equipment
Local CodesComply with all local building and gas codes
Manufacturer SpecificationsFollow Nordyne installation guidelines exactly

Kit Contents and Components

Complete inventory of conversion kit components.

  1. LP Orifice Set: Complete set of propane orifices for all burner sizes
  2. Gas Valve Conversion Kit: Pressure regulator springs and adjustment tools
  3. Installation Manual: Step-by-step conversion instructions
  4. Warning Labels: LP gas conversion identification stickers
  5. Pressure Test Port Adapter: For manifold pressure measurement
  6. Sealant: Approved pipe thread compound for gas connections

WARNING! Verify all components are present before beginning installation. Do not substitute components.

Pre-Installation Requirements

Preparation steps before beginning conversion.

  1. Turn off electrical power to furnace at circuit breaker
  2. Shut off gas supply at main valve upstream of furnace
  3. Verify furnace model compatibility with conversion kit
  4. Gather required tools: manometer, wrenches, screwdrivers, leak detection solution
  5. Review local codes and obtain necessary permits
  6. Ensure adequate workspace and lighting around furnace

CAUTION! Failure to properly shut off gas and electricity can result in fire, explosion, or electrocution.

Conversion Procedure

Pressure Adjustment and Testing

Proper pressure settings and verification procedures.

Manifold Pressure: Set to 10-11 inches WC for LP gas operation. Use manometer connected to pressure tap.

Gas Valve Adjustment: Turn adjustment screw clockwise to increase pressure, counterclockwise to decrease.

Leak Testing: Apply soap solution to all gas connections. Bubbles indicate leaks.

Combustion Analysis: Verify proper CO2 levels and flame characteristics.

Post-Installation Verification

Final checks and system validation.

  1. Start furnace and observe ignition sequence
  2. Verify stable flame with proper blue color
  3. Check for unusual noises or vibrations
  4. Monitor furnace through complete heating cycle
  5. Verify thermostat operation and temperature control
  6. Complete installation checklist and customer briefing

Tip: Allow furnace to complete several heating cycles before final inspection.

Technical Specifications

Supported furnace models and technical requirements.

Maintenance Guidelines

Routine maintenance for LP furnace operation.

Annual inspection by qualified technician. Regular filter changes. Burner cleaning as needed. Vent system inspection. CO detector testing.

CAUTION! Only qualified personnel should perform maintenance on gas appliances.

Warranty Information

Limited warranty coverage and terms.

90-day limited warranty on conversion kit components. Original furnace warranty remains in effect when conversion is performed by authorized technician. Warranty void if installation instructions are not followed exactly.

Troubleshooting Guide

SymptomPossible CauseCorrective Action
Furnace won't igniteGas pressure incorrectVerify manifold pressure setting (10-11" WC)
Yellow flameAir mixture incorrectAdjust primary air shutter; clean burners
Gas odorLeaking connectionShut off gas immediately; check all connections with soap solution
Furnace short cyclesOverheatingCheck airflow; clean filter; verify venting
No heat outputThermostat issueCheck thermostat settings and wiring

Technical Support: 1-800-422-4328; www.nordyne.com

Emergency Service: Contact qualified HVAC technician immediately for gas leaks or CO detection

Nordyne Furnace LP Conversion Kit Manual © - All Rights Reserved 2025