Nordyne M1M Furnace Manual

The Nordyne M1M Furnace is a high-efficiency gas furnace designed for residential heating applications. This manual covers the M1M series with features including multi-speed blower operation, electronic ignition, diagnostic LED system, safety controls, and compatibility with various thermostat types. Below are key sections for safety, installation, operation, maintenance, and troubleshooting.

1. Features at a Glance 2. Installation Requirements 3. Initial Setup & Startup 4. Technical Specifications 5. Controls & Operation 6. Venting & Combustion Air 7. Maintenance Procedures 8. Safety Features 10. Regulatory Information 11. Troubleshooting Guide

Features at a Glance

Key components: Gas valve, heat exchanger, blower assembly, control board, pressure switches, igniter, flame sensor.

FeatureDescription
Multi-speed blowerVariable speed operation for optimal airflow
Electronic ignitionHot surface igniter for reliable startup
Diagnostic LEDFlashing codes for troubleshooting
Safety controlsPressure switches, rollout switches, flame sensor
Gas valveRegulates natural gas or propane flow
Heat exchangerStainless steel construction for efficiency
Filter accessEasy-access filter compartment
Control boardIntegrated furnace controller
Thermostat connectionsStandard 24V thermostat terminals
Service switchesPower disconnect and door safety switch

Installation Requirements

Professional installation required. Verify local codes and obtain permits.

  1. Location: Install in dry, clean area with adequate clearance for service access.
  2. Venting: Properly size and install vent pipes according to manufacturer specifications.
  3. Gas supply: Connect to appropriate gas line with shutoff valve.
  4. Electrical: Connect to 120V AC power with proper grounding.
  5. Ductwork: Ensure proper sizing and sealing of supply/return ducts.

WARNING! Gas appliances can be hazardous; installation must comply with all local codes and regulations.

Initial Setup & Startup

Complete installation verification before initial startup.

  1. Gas pressure check: Verify inlet and manifold pressures are within specifications.
  2. Venting verification: Confirm proper draft and vent pipe integrity.
  3. Electrical connections: Check all wiring for proper connections and grounding.
  4. Thermostat setup: Connect compatible thermostat and set heating mode.
  5. Initial startup: Follow lighting instructions; observe first heating cycle.

CAUTION! Only qualified technicians should perform startup procedures.

Technical Specifications

Controls & Operation

Access control board via front panel removal. Thermostat controls heating cycles.

Control Board: Diagnostic LED, terminal connections, dip switches for configuration.

Operation Sequence: Thermostat call for heat → inducer motor starts → pressure switch proves → igniter heats → gas valve opens → flame sensor confirms → blower starts after delay.

Settings: Blower speeds (heating/cooling), temperature rise adjustment, fan on/off delays.

Venting & Combustion Air

Proper venting critical for safe operation. Category I venting required.

  1. Vent pipe sizing: Follow manufacturer specifications for pipe diameter and length.
  2. Combustion air: Ensure adequate fresh air supply for proper combustion.
  3. Vent termination: Locate according to clearance requirements from windows, doors.
  4. Condensate drainage: Properly route and trap condensate line.

Tip: Regular inspection of vent system prevents blockage and ensures safety.

Maintenance Procedures

Annual professional maintenance recommended. Monthly filter changes.

  1. Filter replacement: Replace standard 1-inch filter monthly during heating season.
  2. Blower cleaning: Vacuum blower wheel and compartment annually.
  3. Heat exchanger inspection: Visual inspection for cracks or damage.
  4. Flame sensor cleaning: Light sanding to remove carbon buildup.
  5. Drain system: Clear condensate trap and drain line.
  6. Safety check: Test all safety controls and gas pressure.

WARNING! Disconnect power before performing any maintenance.

Safety Features

Multiple safety systems protect against hazardous conditions.

Safety DeviceFunction
Flame rollout switchDetects flame outside combustion chamber
Pressure switchesVerify proper venting airflow
Flame sensorConfirms burner ignition
High limit switchPrevents overheating
Gas valveAutomatic shutoff if flame not detected
Door safety switchDisables operation when panel removed

Regulatory Information

ANSI Z21.47: Certified for US and Canadian standards. CSA International approved. UL listed. Installation must comply with National Fuel Gas Code (NFPA 54) and local building codes. For technical support, contact Nordyne at 1-800-422-4328 or visit www.nordyne.com.

Troubleshooting Guide

SymptomPossible CauseCorrective Action
Furnace won't startPower, thermostat, door switchCheck circuit breaker, thermostat settings, door panel secure
No heatGas supply, igniter, flame sensorVerify gas valve on, check igniter operation, clean flame sensor
Short cyclingDirty filter, high limitReplace filter, check airflow, verify limit switch operation
Blower won't runMotor, capacitor, control boardCheck motor voltage, test capacitor, verify control signals
Lockout conditionSafety device trippedReset power, check diagnostic LED codes, clear fault
Unusual noisesBlower, inducer, ductworkInspect blower wheel, check inducer motor, examine duct connections

Diagnostic Codes: Refer to control board LED flash patterns for specific error codes.

Service: 1-800-422-4328; www.nordyne.com

Nordyne M1M Furnace Manual © - All Rights Reserved 2025