The Ruud Gas Furnace is a high-efficiency heating system designed for residential applications, featuring advanced combustion technology, variable-speed blower motors, and multiple safety controls. This manual covers proper installation procedures, safety requirements, electrical connections, gas line connections, venting systems, startup procedures, and maintenance guidelines for optimal performance and safety compliance.

1. Safety Precautions 2. Pre-Installation Requirements 3. Unit Specifications 4. Installation Location 5. Gas Supply Connection 6. Electrical Wiring 7. Venting System 8. Ductwork Connection 9. Startup Procedure 10. Commissioning & Testing 11. Troubleshooting

Safety Precautions

Critical safety information for proper furnace installation and operation.

HazardPrecaution
Gas LeaksCheck all connections with leak detection solution
Carbon MonoxideEnsure proper venting and combustion air supply
Electrical ShockDisconnect power before servicing
Fire HazardMaintain proper clearances from combustible materials
Burn RiskAllow unit to cool before handling components

Pre-Installation Requirements

Essential preparations before beginning furnace installation.

  1. Verify local codes and obtain necessary permits
  2. Check furnace model matches job requirements
  3. Inspect unit for shipping damage
  4. Ensure adequate workspace and clearance
  5. Gather required tools and materials

WARNING! Installation must comply with all local building codes and NFPA 54/ANSI Z223.1 standards.

Unit Specifications

Installation Location

Proper furnace placement is critical for safety and performance.

  1. Indoor location only - protected from weather
  2. Minimum 24" front clearance for service access
  3. 6" clearance from combustible materials
  4. Adequate combustion air supply required
  5. Level, solid foundation necessary

CAUTION! Do not install in areas containing corrosive chemicals or flammable vapors.

Gas Supply Connection

Proper gas line installation procedures.

  1. Shut off main gas supply
  2. Install sediment trap upstream of gas valve
  3. Use approved pipe thread compound or tape
  4. Pressure test at 14" W.C. for 10 minutes
  5. Check for leaks with approved detection solution

WARNING! Gas piping must be sized according to NFPA 54. Maximum inlet pressure 14" W.C.

Electrical Wiring

Electrical connection requirements and procedures.

ConnectionSpecification
Line Voltage120V, 15A dedicated circuit
Thermostat24V, 18-22 gauge wire
GroundingProper equipment grounding required
DisconnectService disconnect within sight of unit
Blower MotorVariable speed ECM motor

Venting System

Vent pipe installation guidelines.

  1. Use only approved vent materials
  2. Maintain proper slope (1/4" per foot)
  3. Secure joints with screws or approved methods
  4. Install condensate drain per local codes
  5. Verify adequate draft during startup

CAUTION! Vent system must terminate at approved location away from windows and air intakes.

Ductwork Connection

Proper duct system connection procedures.

  1. Size ducts according to Manual J calculation
  2. Seal all joints with approved mastic
  3. Install filter rack with proper size filter
  4. Provide adequate return air capacity
  5. Balance system for proper airflow

Tip: Measure static pressure to verify proper duct sizing.

Startup Procedure

Step-by-step furnace startup and verification.

  1. Verify all connections are secure
  2. Open main gas shutoff valve
  3. Restore electrical power
  4. Set thermostat to heat mode
  5. Observe ignition sequence
  6. Check gas pressure adjustments
  7. Verify proper flame characteristics
  8. Measure temperature rise

WARNING! Never bypass safety controls during startup. Follow manufacturer's sequence exactly.

Commissioning & Testing

Final verification and system testing.

Troubleshooting

SymptomPossible CauseCorrective Action
No ignitionGas supply, igniter, pressure switchCheck gas valve, replace igniter, verify pressure switch operation
Short cyclingDirty filter, airflow restrictionReplace filter, check ductwork, verify proper airflow
Blower not runningMotor, capacitor, control boardCheck voltage to motor, test capacitor, inspect control board
Lockout conditionFlame sensor, gas valveClean flame sensor, check gas valve operation
Excessive noiseBlower wheel, motor bearingsInspect blower wheel balance, lubricate or replace motor

Reset: Power cycle unit to clear lockout conditions.

Service: Contact authorized Ruud dealer for technical support and warranty service.

Ruud Gas Furnace Installation Manual © - All Rights Reserved 2025